Georgetown University Hospital CyberKnife II

Washington, DC

On a very tight site, a second floor concrete CyberKnife vault is cantilevered from eight concrete drilled piers.

Owner:

Georgetown University Hospital

Occupancy:

CyberKnife Stereotactic Radiosurgery Suite and Hyperbaric Treatment room

Total Area:

9,300 SF

Equipment:

Accuray CyberKnife with RoboCouch

Construction:

Cast-in-place concrete drilled piers supporting cantilevered second floor concrete CyberKnife vault with brick veneer panels.

Design/Construction:

28 weeks / 41 weeks